Tuesday, 1 November 2016

Team Meeting 01/11/16

In today's team meeting we talking about final filming times as well as continuing with with editing. For our final shoot we shall be going to leake street and Waterloo in the morning as well as going to see the fireworks and film them in the afternoon. We have booked the camera for the weekend 

Tuesday, 11 October 2016

Research & Planning

Permission to grant access to our actor to premises

Storyboard

Made by Usman





Team Meeting Project "SLF" 11/10/16

In todays team meeting, we catched up on everything like the storyboard and made sure we are working at the same pace and up to date. We then discussed what are our next steps are and decided on our first shooting, which will be in the studio on wednesday which we have booked for.

Call Sheet



Risk Assessments



Team Meeting Project "SLF" 04/10/16

In today's lesson Shivam, one of our team members was not available, therefore we were unable to have a proper complete team meeting, however we did get lots of progress on the storyboard and we managed to get permission for the use of the music and have asked permission for the use of locations.

Permission Requested for the use of Olympic park and Leake St Vaults

Permission sought by Hasan


Permission given for the use of music

By Hasan and Usman

Team Meeting 03/10/2016 Project "SLF"

In today's lesson we were given revised information about our original music video which was too inappropriate to use for our assignment, therefore we needed to change the song so that it was fit and suitable for our coursework as well as something that was of a similar genre so we wouldn't need to change our previous work. The new song that we have chosen was Memories by Leonell Cassio featuring Anne Lan and remixed by Goblins From Mars.

Tuesday, 4 October 2016

Release form for Studio use at LSC

This is an image of the release form allowing us to use the studio within our college.

Team roles during this project

Usman - I will be operating the camera mostly ensuring our actor is in shot and that we are matching our shots as best as we can to the story bored, I will also be doing a majority of the editing once all our filing is done.

Hasan - Will be managing time as well as making sure everyone is available for shooting dates in addition to attempting to getting permission to film at our chosen locations. Will also be operating the [secondary] camera (when available) and ensuring we have enough shots to use.

Shivam -  Will be looking after equipment and ensuring that it is all returned without any damage, in additon he will also be in contact with our actor relaying dates of availability to us, so that we are able to plan our shooting dates more effectively, he will also be in charge of costume.

Friday, 30 September 2016

Pitch for Music video Plus Feedback


During our presentation of this pitch we got a lot of feedback on our ideas and the changes that could make to our music video.

Some useful Feedback we recieved include, looking back at our case studies and other similar genred music videos and see how we can use ideas from them aswell as our own to combine and make the music video. for example, when there is a fast beat we can use multiple scenes with fat cut throughs.

We reviewed the song lyrics and they were inappropriate, and we have chosen to replaced it with this new song below. The new song we have chosen is not very different to the previous one as instead of being about expressing her feelings about getting together its about her saying they should stay away.

https://www.youtube.com/watch?v=eF8l2Lykmnw